A series of entries designed to capture the ongoing adventures of NINA! See how we came to be where we are today, and follow along as we enter the new century of social media!

The new stained glass window, inside and Out

David
29 Ashley Street
2/23/2023

The new stained glass window has been installed – for the moment – to see how it will look.  We went back this evening to have a look, as we had adjusted an interior light to add to its effect when seen from the outside.



Progress at 29 Ashley

David
29 Ashley Street
2/23/2023

The kitchen cabinets are in, and the kitchen has been taken over as a break room.  The new railing on the second floor is also in, so no more precarious photos from that hallway.



Capturing difficult perspectives for potential funders

David
279 Farmington Avenue,285 Farmington Avenue
2/20/2023

It isn’t surprising or unexpected that, when you develop blighted historic houses as opportunities for homeownership, that funders want exterior views of all four sides of the house.  This is particularly the case for the State Historic Preservation Office. 

The two houses at 279 and 285 Farmington present a challenge in this regard, as they are so close together.  And although it fits very well with the original house, this eastern part of 285 Farmington is not historic – it was an addition constructed in the 1980s by TSKP Group, which had their offices here.

So, a couple of shots to show the effort, plus one bleak, dystopic shot of both houses.



Progress at 29 Ashley

David
29 Ashley Street
2/15/2023

The porch has a floor, progress on the kitchen cabinets, getting the baseboard ready, work on the second-floor stair rail, plus a view from the foyer of the two stained glass windows, old and new.



The end of the pandemic at Veeder Place?

David
News
2/13/2023

The red cap that had been locked in place on the water fountain outside our office here on the third floor of Veeder Place has been unlocked and removed – albeit, not taken away.  The cap was put into place during the pandemic to secure the health and safety of Veeder Place tenants, so its removal is a positive development!

Of course, the water fountain doesn’t work.  Hasn’t for awhile.  So, we’re still safe!

 



Kitchen cabinets going in at 29 Ashley

David
29 Ashley Street
2/8/2023

The kitchen cabinets are taking their places in the kitchen.



Progress at 29 Ashley

David
29 Ashley Street
2/1/2023

Work on the porch, the kitchen cabinets have arrived, detail work on the interior trim, and a precarious view of the staircase.



New floors in at 29 Ashley

David
29 Ashley Street
1/25/2023

Shots of the new floors on the first foor and the second floor.



New floors at 29 Ashley

David
29 Ashley Street
1/17/2023

New hardwood floors being installed.



Progress at 29 Ashley

David
29 Ashley Street
1/5/2023

Interior work with the gang from ServCorps plus work on the staircase.



| Older Posts