The front walk goes in at 1 imlay -- and the back walk, too

07/28/2014 |

Category: 1 Imlay Street

Our paving contractor started work on the front and back walks at 1 Imlay Street today.  The design and materials were selected in consulation with the future homeowners.

Share this: