Progress at 115 Sigourney Street

09/07/2018 | David

Category: 115 Sigourney Street

We're moving along steadily at 115 Sigourney -- the new floor plan is beginning to emerge, especially on the second floor.  Shots here include a look at the future kitchen, future dining room, future north and south parlors, and a last look (probably) at the past staircase to the second floor.  Some fun items to note, both in the north parlor, include the pockets we uncovered where there were once French doors and the brick interior wall, which once upon a time would have been the front exterior wall of the house.  The doorway there could well have been the location of the original front door of the house!

Upstairs, we've done a lot of framing.

Share this: