4/8/2011 | David
Category: 33 Sargeant Street
The shot from the third floor is the final day of the “Closet Doors Drying” installation.
Share this:
Progress at 279 Farmington
Flowers in the asphalt
A walk around the outside of 279 and 285 Farmington
Meanwhile, down at Sigourney Square park
Progress at 102 Huntington
Traffic problems on Huntington Street