12/16/2013 | David
Category: 1 Imlay Street
The front-loader started work by knocking itself sideways into the south wall. It crumpled easily.
Share this:
Tried a different route to work today
And back into the street at Veeder Place
More snow
Many thanks to ConnectiCare!
The entryway floor in detail at 102 Huntington
88 Ashley in the snow
CPR training at Veeder Place