12/26/2014 |
Category: 54 Huntington Street
A walk around the interior, now that the floor plan has fully emerged.
Share this:
Stained glass, inside and out, at 29 Ashley
Another view of blocking the box at the Trident
Progress at 287-289 Sargeant
Progress at 29 Ashley
For the record, this is what “blocking the box” looks like
Interior Shots at 287-289 Sargeant