Work Begins on the Staircases at the zunner building

04/27/2015 |

Category: 207-213 Garden Street

These photos are looking down from the third floor.  The stairs at the bottom of the well are the stairs coming in from the outside.  The landings, which mark the halfway point between floors, remain in place.

Share this: