06/10/2019 | David
Category: 115 Sigourney Street
Carl of Farmington Valley Wall Concepts painting the gable.
Share this:
Work on the front porch underway at 102 Huntington
Shots fired at Veeder Place
A bad day at Veeder Place
Quick check on the porches at 102 Huntington
Work underway at 88 Ashley Street
Inside 279 Farmington
Interior details at 285 Farmington