3/25/2021 | David
Category: 80-82 Hawthorn Street
The second floor is in place, adn the roof trusses are arriving.
Share this:
Ah, the Trident
Progress at 29 Ashley
Fireplace surround and mantle, and the porch, at 29 Ashley
Feedback on the proposed Asylum Ave road diet
Feeding the local flamingos
Wood and tile work at 29 Ashley