Now that we’re getting near the end of this project, we’ve been able to repair the sidewalk around 80 Hawthorn.  I won’t lie, we did make the sidewalk a little worse, especially along South Marshall Street, with our construction equipment, but the sidewalk was a mess long before we got onto the scene.  We’re awfully glad to have reached this point, both because we’ve been eager to repair the sidewalk and because this signals we’ll soon have these houses on the market.

Also, the hardwood floors are being installed.  This is just a good day for walking at 80 Hawthorn!