12/17/2021 | David
Category: Safe Growth
Another block down Sargeant Street, and more signs that need replacement. At least the fire hydrants have been re-painted.
Share this:
Stained glass, inside and out, at 29 Ashley
Another view of blocking the box at the Trident
Progress at 287-289 Sargeant
Progress at 29 Ashley
For the record, this is what “blocking the box” looks like
Interior Shots at 287-289 Sargeant