3/10/2023 | David
Category: 29 Ashley Street
Window and door frames are going up, the decorative pediments are back on the main staircase, and the tiles are going into the second floor bathroom. Plus some work on the front porch.
Share this:
Fun sign on the door at Veeder Place
More work at 223 Garden Street
More work at 207 Garden Street
Blocked box at the Trident, of course
Walks are in at 207 Garden Street
Repairs at 223 Garden Street
Progress on the patio at 207 Garden