8/1/2025 | David
Category: 279 Farmington Avenue
Framing on the first floor. Work inside the front porch. Framing starting on the second floor. View of the third floor.
Share this:
Progress at 279 Farmington
Flowers in the asphalt
A walk around the outside of 279 and 285 Farmington
Meanwhile, down at Sigourney Square park
Progress at 102 Huntington
Traffic problems on Huntington Street