9/6/2025 | David
Category: 279 Farmington Avenue
A little more work on framing since the last time.
Share this:
Tried a different route to work today
And back into the street at Veeder Place
More snow
Many thanks to ConnectiCare!
Progress at 102 Huntington
The entryway floor in detail at 102 Huntington
88 Ashley in the snow