9/25/2025 | David
Category: 285 Farmington Avenue
Just about everything has now been stabilized. Next step will be the demolition of the 1980s addition!
Share this:
Tried a different route to work today
And back into the street at Veeder Place
More snow
Many thanks to ConnectiCare!
The entryway floor in detail at 102 Huntington
88 Ashley in the snow
CPR training at Veeder Place