12/18/2025 | David
Category: 102 Huntington Street
If nothing else, it’s been awhile since I could go in through the front door. Plus that new staircase: wow! Tiling in the bathrooms, which is why the toilet is in a different room and serving as a table.
Share this:
Setting up before the event
Not really a good sign
An interesting feature left intact at 285 Farmington
Getting ready to remove the cement slab at 285 Farmington
Progress at 102 Huntington
Posts on the front porch at 102 Huntington
NINA’s Plimpton House receives an Award of Merit from Preservation Connecticut