1/16/2026 | David
Category: 102 Huntington Street
Back deck with railing. Front porch. Kitchen. Front door and entryway floor. Primary bedroom as work area.
Share this:
Progress at 279 Farmington
Flowers in the asphalt
A walk around the outside of 279 and 285 Farmington
Meanwhile, down at Sigourney Square park
Progress at 102 Huntington
Traffic problems on Huntington Street