3/13/2026 | David
Category: 102 Huntington Street
At work on the front door. A toilet in the first-floor bathroom. A toilet in the primary bedroom suite. Two toilets in the second-floor bathroom.
Share this:
Progress at 279 Farmington
Flowers in the asphalt
A walk around the outside of 279 and 285 Farmington
Meanwhile, down at Sigourney Square park
Progress at 102 Huntington
Traffic problems on Huntington Street