Progress at 102 Huntington

4/1/2026 | David

Category: 102 Huntington Street

Some work on the great fireplace surround:  arranging tiles on the floor before putting them into place.  These were custom-made for NINA, and the large corner squares recall the woodwork in the mantle.

Then, a walk around the house:  the kitchen cabinets have arrived; work on the railing; the bench on the landing; the second floor hall; looking from second floor onto back deck; and the southwest bedroom.