Progress at 279 Farmington

David
279 Farmington Avenue
6/4/2025

Interior demolition nearing the end.



Progress at 102 Huntington Street

David
102 Huntington Street
6/4/2025

Framing mostly done – and ductwork for the new HVAC system underway.



A peek inside 285 Farmington

David
285 Farmington Avenue
5/30/2025

Haven’t started interior demolition yet.  No power, so no lights, so this was a bit of practice to get right with my flash.  Included one self-portrait, because it looks haunted.



Progress at 279 Farmington

David
279 Farmington Avenue
5/28/2025

The walls are gone.  Plus shots of all three staircases from the first floor, two to the second floor and one to the basement.



Another shot of the roses at Veeder Place

David
5/27/2025

And look:  the cup is gone!  But the flowers really are lovely.



Some closeups at 285 Farmington

David
285 Farmington Avenue
5/27/2025

Writing an application for funding, don’t you know.



Progress at 279 Farmington

David
279 Farmington Avenue
5/21/2025

Still having trouble with my flash.  The third floor has now been demolished.