6/4/2025 | David
Category: 279 Farmington Avenue
Interior demolition nearing the end.
Share this:
Progress at 102 Huntington
Progress at 279 Farmington
A look at the addition at 285 Farmington
This always sucks
Progress at 285 Farmington