225

Update on the front door of 102 Huntington Street

David
102 Huntington Street
6/24/2025

The interior side of the door has been prepped and sanded.



Progress at 285 Farmington

David
285 Farmington Avenue
6/20/2025

Still trying to work out how to take photos in this house.



Progress at 279 Farmington

David
279 Farmington Avenue
6/20/2025

It is easier when there is natural light.



Progress at 102 Huntington

David
102 Huntington Street
6/20/2025

First few stairs into the basement.



Volunteers from M&T Bank

David
285 Farmington Avenue
6/17/2025

We had a group of volunteers from M&T Bank pitching in with the interior demolition at 285 Farmington Avenue.  Thanks for helping out with our project!



Update on the front door of 102 Huntington Street

David
102 Huntington Street
6/16/2025

The old paint has been stripped off, and the door knob and locks have been removed.



New gas line at 102 Huntington

David
102 Huntington Street
6/16/2025

Connecticut Natural Gas had a crew there today, installing a new gas line.  This is part of getting a new gas meter that will now be on the exterior of the house.