Work on the porch at 102 Huntington underway

David
102 Huntington Street
7/7/2025

New posts and rails on the way!



Update on the front door of 102 Huntington Street

David
102 Huntington Street
7/2/2025

Repair work continues.



Progress at 102 Huntington

David
102 Huntington Street
7/2/2025

New framing in the ceiling of the kitchen.  The staircase into the basement.  Framing on the second floor.  The remains of the kitchen bay window, from the exterior.



Progress at 279 Farmington

David
279 Farmington Avenue
7/2/2025

Third floor.  Ernest Brown at work on the second floor.  First floor.



A look at the addition at 285 Farmington

David
285 Farmington Avenue
7/2/2025

The addition at 285 Farmington as viewed from the northeast corner of the building.  Looking from the lower soffit, just below the higher soffit on the main house, you can see a straight line that definitively demarcates the addition.

The addition was constructed in the late 1980s by TSK Group, when they had their offices here.  They did an excellent job matching the brick, not only in terms of color but also in terms of levels – the bricks line up almost perfectly between the main house and the addition.  The main difference between the two sections is the lintels:  one solid lintel in the main house, a row of bricks in the addition.  We believe that the porch wrapped around the corner of the building, although we don’t know how far along the east side of the building it went.

Our plan is to demolish the addition.  It isn’t quite historic, clocking in at about 35 years old, but it was structurally devastated by a whole in the roof, which has been there for at least 10 years, if not 15.



Update on the front door of 102 Huntington Street

David
102 Huntington Street
6/30/2025

Now it’s the time to do the exterior side!  There was also some work to repair the door that began today.



This always sucks

David
6/27/2025

Public utilities that tear up our streets and sidewalks are supposed to put them back the way they were.  This is the corner of Sargeant and Garden, and the work was done by MDC.  Despite the different bricks, sadly we have to appreciate this:  the public utilities usually would fill in a gap like this with asphalt and call it a day.  So, yay?